Intel and its superloads

Intel and its superloads
By: Marginal Revolution Posted On: June 13, 2024 View: 27

Intel’s new campus coming to New Albany, OH, is in heavy construction, and around 20 super loads are being ferried across Ohio’s roads by the Ohio Department of Transportation after arriving at a port of the Ohio River via barge. Four of these loads, including the one hitting the road now, weigh around 900,000 pounds — that’s 400 metric tons, or 76 elephants. The super loads were first planned for February but were delayed due to the immense planning workload. Large crowds are estimated to accumulate on the route, potentially slowing it even further.

Intel’s 916,000-pound shipment is a “cold box,” a self-standing air-processor structure that facilitates the cryogenic technology needed to fabricate semiconductors. The box is 23 feet tall, 20 feet wide, and 280 feet long, nearly the length of a football field. The immense scale of the cold box necessitates a transit process that moves at a “parade pace” of 5-10 miles per hour. Intel is taking over southern Ohio’s roads for the next several weeks and months as it builds its new Ohio One Campus, a $28 billion project to create a 1,000-acre campus with two chip factories and room for more. Calling it the new “Silicon Heartland,” the project will be the first leading-edge semiconductor fab in the American Midwest, and once operational, will get to work on the “Angstrom era” of Intel processes, 20A and beyond.

Here is the source, via Mathan Glezer.

Adblock test (Why?)

Read this on Marginal Revolution Header Banner
  Contact Us
  • Contact Form
  Follow Us
  About

Brainfind is your one-stop shop for breaking news headlines and personalized news stories. Not only are we a news aggregator and content curator, we also allow registered users to publish their own articles on our website with full credit and their social links.